Do You Need a Deck Permit in Seattle?

Short answer
Sometimes

You need a construction permit for a deck more than 18 inches above the ground or any roof deck. Most decks on neighborhood residential lots get a same-day Subject-to-Field-Inspection (STFI) permit.

Source: Seattle SDCI Tip 312: Decks, Fences and Arbors

A grey wooden deck overlooking a grassy backyard
Get 3 Local Quotes

Seattle Deck Permits at a Glance

Permits, last 12 months
88
Issued, last 30 days
9
Median application to issue
7 days
Median declared job value
$20,000
Issuing office
Seattle Department of Construction and Inspections (SDCI)
Rule last checked
October 30, 2026

Permits Issued per Month

0 Nov 1 Dec 1 Jan 2 Feb 7 Mar 8 Apr 11 May 18 Jun 13 Jul 7 Aug 10 Sep 9 Oct
Seattle deck permits issued per month, Nov 2025 to Oct 2026. Lighter bar = current month to date.

Counts are approximate: we match permit types and descriptions to deck work. Data from Seattle Building Permits, refreshed October 30, 2026.

What Seattle's Rules Say

  • Permit if more than 18 in above ground or a roof deck (SRC R105.2).
  • Most decks qualify for an over-the-counter STFI permit.
  • Decks over 36 in count toward lot coverage.

Seattle Deck Permit Fees

We have not verified Seattle's fee for this work from an official fee schedule yet, so we don't quote one. The Seattle Department of Construction and Inspections (SDCI) sets the fee when you apply.

Busiest Areas for Deck Permits

ZIP codePermits (12 mo)
9812110
981158
981127
981366
981036
981445

How to Get a Deck Permit in Seattle

  1. Confirm the rule for your exact job on the official page cited above. Size, height, structure and location (historic district, floodplain) can change the answer.
  2. Choose who applies. Many permits here must be pulled by a licensed contractor; ask any contractor to name the license they will use.
  3. Apply with the Seattle Department of Construction and Inspections (SDCI) through the official department website.
  4. Schedule inspections as the permit requires, and keep the final approval with your house records.

Recent Seattle Deck Permits

IssuedAddressWork
2026-10-266801 48Th Ave NeConstruct repairs to water-damaged attached deck for one-family dwelling subject to field inspection (STFI).
2026-10-234501 35Th Ave SReplace decking and railing of entry porch and stairs of a one-family dwelling subject to field inspection (STFI)
2026-10-151708 E Highland DrConstruct site improvements and repairs to existing multifamily building at exterior deck per plan.
2026-10-157051 20Th Ave NeRemove existing and construct wood stairs and porch at east side of existing residence Subject to Field Inspection (STFI
2026-10-145023 29Th Ave SConstruct repairs to existing one family dwelling at exterior deck per plan.
2026-10-14907 N 83Rd StConstruct exterior deck to replace and expand existing deck for one-family dwelling subject to field inspection [STFI].
2026-10-148435 20Th Ave SwConstruct deck alterations to existing one-family dwelling subject-to-field inspection (STFI).
2026-10-092543 Perkins Ln WConstruct new decks for existing one family dwelling per plan.
2026-10-022801 31St Ave WConstruct deck at west side of existing one family residence subject to field inspection (STFI).
2026-09-285623 49Th Ave SwConstruct exterior entry deck and stairs to replace and expand existing for one-family dwelling subject to field inspect

Addresses and work descriptions as published by the city. Owner names and phone numbers are removed.

Seattle Deck Contractors: Get Weekly Permit Lists

Contractors: get new permits for your trade and city every Monday. Join the waitlist.

Frequently Asked Questions

Do I need a deck permit in Seattle?

Sometimes. You need a construction permit for a deck more than 18 inches above the ground or any roof deck. Most decks on neighborhood residential lots get a same-day Subject-to-Field-Inspection (STFI) permit.

How many deck permits does Seattle issue?

Seattle issued 88 permits matching deck work between October 30, 2025 and October 30, 2026, about 7 a month. The busiest month was Jun 2026 with 18.

How much does a deck permit cost in Seattle?

We have not yet verified Seattle's fee for this work from an official fee schedule, so we do not quote one. The fee is set by the Seattle Department of Construction and Inspections (SDCI) when you apply.

How long does it take to get a deck permit in Seattle?

Based on the city's records, the median time from application to issue for these permits was 7 days over the last 12 months.

Who issues deck permits in Seattle?

The Seattle Department of Construction and Inspections (SDCI).

Related Permit Guides

Written and maintained by the Home Permit Guide Editorial TeamPlaceholder profile

Last updated

This is a placeholder editorial profile. A named reviewer with verifiable experience will be added here. Until then, every rule on this page links to the official government source it was checked against. Read our editorial policy.

Sources

Official sources checked on . Rules change; confirm with the department before you start work.

  1. Seattle SDCI Tip 312: Decks, Fences and Arbors (linked above) (web.seattle.gov)