Do You Need a Solar Panel Permit in Raleigh?
Yes
Solar adds electrical wiring and equipment, which North Carolina excludes from the $40,000 permit exemption, so a rooftop solar system in Raleigh needs a permit.
Source: N.C. General Statute 160D-1110
Raleigh Solar Panel Permits at a Glance
- Permits, last 12 months
- 11
- Issued, last 30 days
- 0
- Median application to issue
- 11 days
- Median permit fee paid
- $392
- Issuing office
- City of Raleigh Permit and Development Services
- Rule last checked
- October 30, 2026
Permits Issued per Month
Counts are approximate: we match permit types and descriptions to solar panel work. Data from Raleigh Building Permits, refreshed October 30, 2026.
What Raleigh's Rules Say
- New electrical wiring and equipment are excluded from the exemption.
- Licensed electrical contractors must be named.
- Roof-mounted arrays may need structural review.
Raleigh Solar Panel Permit Fees
We have not verified Raleigh's fee for this work from an official fee schedule yet, so we don't quote one. The City of Raleigh Permit and Development Services sets the fee when you apply. For context, the median fee actually paid on these permits in the city's records was $392.
Busiest Areas for Solar Panel Permits
| ZIP code | Permits (12 mo) |
|---|---|
| 27612 | 4 |
| 27615 | 2 |
| 27610 | 2 |
| 27604 | 2 |
| 27609 | 1 |
How to Get a Solar Panel Permit in Raleigh
- Confirm the rule for your exact job on the official page cited above. Size, height, structure and location (historic district, floodplain) can change the answer.
- Choose who applies. Many permits here must be pulled by a licensed contractor; ask any contractor to name the license they will use.
- Apply with the City of Raleigh Permit and Development Services through the official department website.
- Schedule inspections as the permit requires, and keep the final approval with your house records.
Recent Raleigh Solar Panel Permits
| Issued | Address | Work |
|---|---|---|
| 2026-07-15 | 3131 Briar Stream Run | Solar Installation of 14.960 KW Residential Roof-Mounted PV System and One Tesla Power Wall Battery |
| 2026-05-26 | 6125 Glenwood Ave | INSTALLATION OF ROOF MOUNTED PHOTOVOLTAIC SOLOR SYSTEM |
| 2026-05-15 | 8521 Falls Of Neuse Rd | installation of a 67.5 DC kw (50.0 AC kw) rooftop PV solar system via NCDOI opt 2. Per PE design and |
| 2026-05-04 | 509 Solar Dr | Convert single family dwelling located at 509 Solar Drive into a duplex: both duplex units to be div |
| 2026-05-04 | 7205 Valley Lake Dr | installation of utility interactive energy storage system in addition to the existing PV system and |
| 2026-04-09 | 3416 Blue Ridge Rd | Installation of a roof-mounted 8.36 KW Solar PV system consisting of (19) modules (1) Tesla Powerwal |
| 2026-04-08 | 2550 Operations Way | REPLACE EXPIRED PERMIT#BLDNR-053404-2024 9096 SF SOLAR PANEL Installation of a 138.03 kW DC 120 kW A |
| 2026-04-07 | 4907 Yadkin Dr | 31.5'x13' In-Ground Concrete Heated Swimming Pool with solar ledge, 6'x7' raised heated spa and 235 |
| 2026-02-24 | 2501 N Raleigh Blvd | Installation of 194.400 kW roof mounted solar The system consists of 360 X LONGI LR5-72HBD-540M sola |
| 2026-02-24 | 7700 Burwell St | Installation of 80.46 kW roof mounted solar at 7700 Burwell St, Raleigh, NC 27615. The system cons |
Addresses and work descriptions as published by the city. Owner names and phone numbers are removed.
Frequently Asked Questions
Do I need a solar panel permit in Raleigh?
Yes. Solar adds electrical wiring and equipment, which North Carolina excludes from the $40,000 permit exemption, so a rooftop solar system in Raleigh needs a permit.
How many solar panel permits does Raleigh issue?
Raleigh issued 11 permits matching solar panel work between October 30, 2025 and October 30, 2026, about 1 a month. The busiest month was May 2026 with 4.
How much does a solar panel permit cost in Raleigh?
We have not yet verified Raleigh's fee for this work from an official fee schedule, so we do not quote one. The fee is set by the City of Raleigh Permit and Development Services when you apply. In the city's own records, the median fee paid on these permits over the last 12 months was $392.
How long does it take to get a solar panel permit in Raleigh?
Based on the city's records, the median time from application to issue for these permits was 11 days over the last 12 months.
Who issues solar panel permits in Raleigh?
The City of Raleigh Permit and Development Services.
Related Permit Guides
- Raleigh Roofing Permits
- Raleigh HVAC Permits
- Raleigh Fence Permits
- Orlando Solar Panel Permits
- Chicago Solar Panel Permits
- Solar Panel Permits by City
- Solar Panel Permit Rules for Homeowners
Sources
Official sources checked on . Rules change; confirm with the department before you start work.
- N.C. General Statute 160D-1110 (linked above) (ncleg.gov)
- Raleigh: Residential Permits (raleighnc.gov)